Lindencenter
Güttingen
New Coop shop with a new self-service Raiffeisen location. Sustainability plays a major role in the construction of the new commercial building. With the latest generation of refridgerated cabinets, whose waste heat is used for heating, and the use of LED lights throughout, energy consumption is significantly reduced compared with conventional construction methods.
Information
Owner
Gerimag AG, Tägerwilen
Services rendered by HRS
Sole contractor with full cost, quality and deadline guarantee
Architect
Beat Oberhänsli Architektur AG, Bottighofen
Plot size
3,142 sqm
Total cost
CHF 3.1 million
Construction period
2016 – 2018