Alternative project Riva
Arbon
The alternative project on the site of the former Hotel Metropol follows the standard construction method and meets all building law standards. The plan is for a four-storey private residential development with 48 condominiums and an underground garage.
Plan A by HRS remains the Riva, which will be voted on by the Arbon population in June. This juried project of an architectural competition was designed according to the wishes and specifications of the city of Arbon and would offer the population numerous benefits, including a restaurant, bar, garden terrace, halls, meeting rooms, hotel rooms and public access to the park and the lake. In the view of HRS, it is an excellent project in the right place. The alternative project will therefore only be considered if the Riva is rejected at the ballot box.
By presenting the alternative project at an early stage, HRS is creating clarity as to what will be built on the site of the former Hotel Metropol if the Riva is rejected.
Information
Client
HRS Investment AG, Frauenfeld
Services rendered by HRS
Project developer, investor and sole contractor with full cost, quality and deadline guarantee
Architect
Michael Meier und Marius Hug Architekten AG, Zurich
Size
Plot area parcelle Metropol 1800 (without a window on the lake) 7'414 m²
Floor area (above ground) 7'333 m²
Floor area (basement) 3'770 m²
Building volume (above ground) 21'451 m³
Building volume (basement) 14'930 m³
Overall cost
CHF 48 Mio.