Meinier

ZIAP La Pallanterie P9

Development comprising the construction of a multi-purpose building of an industrial and artisanal nature. The building is approximately 36 x 44 x 15 metres and has two basement levels, a ground floor, a mezzanine above the ground floor, a first floor and an attic. The two basement levels are intended for parking for approximately 134 passenger and/or commercial vehicles and 39 two-wheelers. The machine rooms will be located in the first basement. “Bulk” delivery of the surfaces for rent.

Download reference sheets

Information

Client

La Fondation Intercommunale des Terrains Industriels et Artisanaux de la Pallanterie, Vesenaz

Services rendered by HRS

Prime contractor with cost, quality and deadline guarantee, open book management with shared savings

Architect

Studio Project Sàrl, Geneva

Dimensions

Built-up area 44,971 m3

Floor area 12,780 m2

Constructioncosts

CHF ~ 17.8 million

Construction time

February 2017 - July 2018